Data center backup power is a crucial element to uptime and availability. During an outage, Uninterrupted Power Supply (UPS) enables the switch from utility power to backup generator power. But there is a relatively unreliable and expensive variable to most UPS: batteries.
Batteries represent three evils: They are big, they are expensive, and they are expendable. Anything you can do to prolong the life of your batteries will indeed extend the availability of your data center.
So here are four ways that data center facility managers can extend the life of their UPS batteries.
(1) Buy the right UPS battery for your data center
In a data center, UPS is designed to fully discharge the battery source within 20 minutes. This is called high-rate discharge. High-rate batteries have thinner plates and more plates than lower-rate batteries, but as a result high-rate batteries can lead to a shorter lifespan.
There are many other factors in buying UPS batteries, such as the life expectancy, voltage, front or top access, flag post or inserted post, and other considerations. For example, a small format valve regulated lead acid (VRLA) battery has a relatively low first cost but lower reliability. Meanwhile, a nickel cadmium (NiCd) battery has the best reliability and longest service life, but the first cost can be four times as much as other batteries.
Data center manager must also be aware of potential manufacturing problems such as faulty post seal design and internal connection problems.
(2) Install, operate and maintain batteries correctly
Incorrect installation can lead to shortened battery life, as can improper maintenance. Good maintenance means giving the batteries well ventilated air that is as close as possible to 77 degrees Fahrenheit, and making sure that all batteries in the string are getting air within 3 degrees Fahrenheit to ensure that some of the batteries don't age more quickly than others.
Why? Mixing batteries of different ages or internal resistances can prompt batteries to die more quickly. Regular inspections of the batteries can unveil problems such as loose intercell connections and damaged post seals, which can lead to corrosion and even fires.
Data center manager should also be aware of the battery's discharge status as well. A fully or nearly fully discharged battery that isn't recharged within 48 hours can lead to damage. Overdischarging a battery can cause recharge problems, and excessive discharging -- for example, if a data center does weekly testing of its backup systems that includes battery cycling -- can reduce battery life.
(3) Monitor the UPS batteries' capacity
When the internal resistance of a battery rises due to normal aging factors such as corrosion, and when it has increased by as little as 30%, it's time to replace them. This is most often measured through capacity testing, as most manufacturers say that when a battery drops to 80% of its original capacity, it's cooked!
Users should perform capacity testing on their batteries based on IEEE standards; in particular, IEEE 1188 or IEEE 450.
(4) Flywheel UPS in conjunction with battery UPS
When flywheel UPS is installed with battery UPS, the flywheels can often handle the shorter power outages that happen more often and can prevent the batteries from cycling. The flywheel UPS also helps to extend battery life by two years preliminary.
In addition, flywheel can filter out the 'dirty power, such as little power blips and spikes. The batteries would filter those spikes out but if you hit the batteries with those spikes, it will kill the battery life.
About Strategic Media Asia Limited
Strategic Media Asia (SMA, www.stmedia-asia.com) is a professional training program and seminar organizer for corporations specialized in data center design & build, mission critical facilities, telecommunications infrastructure, financial IT and colocation services. Currently, SMA delivers a series of critical infrastructure training courses and qualification programs in Hong Kong and Macau.
For details, please visit www.stmedia-asia.com/trainings.html.
Best Practices for Critical Facilities Design, Efficiency and Operations
Wednesday, June 25, 2014
Wednesday, June 11, 2014
Preparatory Course - Become a Register of Specialist Contractors (Sub-register of Ventilation Works Category)
SMA is going to launch a new preparatory course which helps engineers / enterprises to facilitate compliance with the Buildings Ordinance and to become a Registered Contractors in Ventilation Works in Hong Kong.
Preparatory Course to Become a Register of Specialist Contractors
(Sub-register of Ventilation Works Category)
4th Round
Date: 31 January and 7 February 2015 (Saturday)
Time: 9:00 - 13:00 / 13:30
Venue: 14/F, On Lok Yuen Building, 25-27A Des Voeux Road Central, Hong Kong
This course is designed for ventilation and air-conditioning engineering company's Technical Director (TD), Authorized Signatory (AS) or other officers successfully becoming a registered specialist contractor (ventilation works category).
Participants will familiarize themselves with the Buildings Ordinance, ventilation and fire safety legislation, occupational safety and health and environmental protection, ventilation and air-conditioning and specialized knowledge, etc. within a short time and up to a professional standards of ventilation / air-conditioning engineer.
Time: 9:00 - 13:00 / 13:30
Venue: 14/F, On Lok Yuen Building, 25-27A Des Voeux Road Central, Hong Kong
This course is designed for ventilation and air-conditioning engineering company's Technical Director (TD), Authorized Signatory (AS) or other officers successfully becoming a registered specialist contractor (ventilation works category).
Participants will familiarize themselves with the Buildings Ordinance, ventilation and fire safety legislation, occupational safety and health and environmental protection, ventilation and air-conditioning and specialized knowledge, etc. within a short time and up to a professional standards of ventilation / air-conditioning engineer.
For syllabus and content, please visit our website:
Course Details (Chinese) or
Course Details (English)
Please download the application at http://www.stmedia-asia.com/images/aircon.pdf
Please download the application at http://www.stmedia-asia.com/images/aircon.pdf