Energy Monitoring?
Efficiency Improvement?
A comprehensive strategy to evaluate your critical infrastructure?
The data center industry and
U.S. Department of Energy (DOE) partnered to develop a
Data Center Energy Practitioner (DCEP) program which certifies energy practitioners to evaluate the energy status and efficiency opportunities in the mission-critical infrastructure worldwide.
The DCEP curriculum was updated in 2016 and formed collaboration with the industry to reinforce proven best practices and to introduce new tools and techniques in key areas such as IT equipment, air management, cooling systems, and electrical systems:-
Level 1 Practitioners ("Generalist", Day 1) will be expected to have a good understanding of 3 data center disciplines (HVAC - Heating, Ventilation and Air Conditioning, Electrical and IT-equipment) for providing broad recommendations based on the high-level DC Pro (Data Center Profiler) Tools.
Level 2 Practitioners ("HVAC-Specialist", Day 2 & 3) address HVAC energy opportunities using in-depth Air Management Assessment Tool.
Successful candidates who complete the 3-day program and pass the exams will gain Data Center Practitioner (DCEP) status by listing their names and contact information on the official website (
http://datacenters.lbl.gov/dcep) as well as issuing certificates.
Level 1 Practitioners ("Generalist") - Day 1
- Generalist Training Introduction
- Data Center Profiler (DC Pro) Overview
- IT Equipment
- Air Management
- Cooling Systems
- Electrical Systems
- Assessment Process Manual
- Data Center Profiler (DC Pro) Case Study
- End of Generalist Training / Exam (2-hour, open-book exam)
Level 2 Practitioners ("HVAC-Specialist") - Day 2 & 3
- HVAC Specialist Training Introduction
- Air Handlers and Air Conditioners
- Liquid Cooling
- Chilled Water Plants
- Cooling System Controls
- Assessment Process
- Modeling Data Center HVAC Systems
- Environmental Requirements
- Airflow and Temperature Management
- DOE Air Management Tool
- End of HVAC Specialist Training / Exam (3-hour, open-book exam)
Official syllabus and program rundown -
http://datacenters.lbl.gov/resources/dcep-typical-training-agenda
Program Speaker
Dr. Bob Sullivan, a Worldwide Eminent Educator and a Data Center Infrastructure Specialist, is the concept creator of Hot Aisle-Cold Aisle. He is the winner of Data Center Dynamics 2016 - Outstanding Contribution to the Data Center Industry Award. TechTarget named Dr. Bob one of "five people who changed the data center" in August 13, 2010.
Exam and Certification
The Level 1 and Level 2 exams are open-book with multiple-choice questions following the training sessions. The result is either Pass or Fail. The passing score is 75%. There is a waiting period of 30 days to retake the exam(s).
Prerequisites to Gain the DCEP Designation (Level 2)
- 4 year technical degree with 3 years verifiable critical facilities design/operation experience; or
- 2 year technical degree with 6 years verifiable critical facilities design/operation experience; or
- 10 years verifiable critical facilities design/operation experience; and
- Completion of the 3-day instructor-led training; and
- Pass the exams of Level 1 and Level 2
Enrollment Details
Date: 16 - 18 May 2018 (Wednesday - Friday)
Time: 09:00 - 18:00
Venue: 19/F, New Victory House (OfficePlus), 103 - 93 Wing Lok Street, Sheung Wan, Hong Kong
Official Rate (3-day): US$2,900 (HK$22,800) per head
Course materials (in digital copy), examinations and applications fees are all included.
For enrollment and registration, please visit
www.stmedia-asia.com/data-center-energy-practitioner-dcep.html.
Applications can be submitted online or by email. The copies of degree certificate(s) and projects / work experience / reference letters will be requested by the official Program Administrator (PA) in U.S.
"ANCIS Incorporated" is the Program Lead and authorised trainer of the Data Center Energy Practitioner (DCEP) program and "Strategic Media Asia Limited" is the approved program partner in Hong Kong for local administration.
Adverse Weather Arrangement - Events in the morning, afternoon or evening will be cancelled if typhoon signal No. 8 or above or black rainstorm warning is still hoisted after (or is announced by the Hong Kong Observatory to be hoisted at / after) 6:00 a.m., 11:00 a.m. and 4:00 p.m. respectively. Delegates will be notified when the class will be made up as soon as possible.
P.S. Think your team might also be interested? Pass it on ›
Strategic Media Asia Limited
Connecting IT, Facilities and Design
T (852) 2117 3893 | F (852) 2184 9978
Room 403, 4th Floor, Dominion Centre, 43 - 59 Queen's Road East, Hong Kong
http://www.stmedia-asia.com | http://green-data.blogspot.com