Data Center Design Consideration: Raised Floor

Despite all many studies claiming raised floor is no longer necessary in data center design, it is still present in the vast majority of data centers or computer rooms. We are going to address several important factors to consider (structural strength, airflow and leakage if you’re using it for cooling and static dissipation) when choosing and installing a raised floor in your critical facilities.


(1) Cooling, Floor Tightness and Airflow


The overhead air ducts in slab (non-raised-floor) designs tends to be limited. When chilled air is delivered under a raised floor and preforming "spot cooled", simply rearranging perforated floor tiles is enough to change the cooling distribution. Also, the plenum under a raised floor offers room for cabling (usually power cables) that doesn’t require the kind of added labor and infrastructure that overhead cabling calls for—cable racks or baskets.




However, massive underfloor air delivery is often problematic and accounts for many of today’s data center cooling problems. Air turbulence can cause uneven air pressure and spotty air delivery. Raised floor heights of 18 inches, 24 inches and even 30 inches or more are needed, and few buildings have the slab-to-slab clearance for that.

On the other hand, the plenum under a raised floor can be subject to obstructions (particularly cabling) and other inefficiencies that hamper cooling. The general consensus is that a raised-floor design cannot meet the cooling needs of higher-density deployments (perhaps in the range of 8–10 kW per rack and up).





There are also code considerations with underfloor air delivery. A data center that uses the raised floor space for cooling may be required by Article 645 of the National Electrical Code to also have an emergency power off button next to exit doors. However, data center owners can avoid this requirement in a number of ways, including not using a raised floor at all.




It’s important that the panels must be square and tight to minimize air leakage, and every edge next to walls and air conditioners and around pipe penetrations must be sealed.

One important thing to remember is that while adjustable dampers on tiles can be very valuable for balancing air delivery among cabinets, adding a damper to any tile effectively reduces its “open percentage” and its airflow, even when the damper is fully open.

For example, a Tate 25% open perforated panel with no damper will pass 746 cfm of air at 0.1 inches of static pressure under the floor. Simply adding a damper and leaving it fully open reduces this to 515 cfm. That’s the equivalent of only 17.4% open. With a 56% open grate tile, the difference is even more dramatic - 2,096 cfm with no damper and only 1,128 cfm with a fully open damper (a reduction from 56% to 30.5% open).

An examination of manufacturers’ airflow characteristics and images, with and without dampers, can quickly reveal this effect.


(2) Ramp


Ramps also take up a lot of space. The Americans with Disabilities Act (ADA) requires at least a 1:12 slope, which means a ramp must have one foot of length for every inch of floor height. In new buildings, a depressed slab will keep the raised floor even with the surrounding corridors, but that takes a special structure.


(3) Building Floor Levelness & Load Capacity


Most building floor slabs are uneven, and they’re designed to flex as weight is added. Raised floors use adjustable pedestals that result in a very level floor surface without needing to level the slab. This makes it easier to align rows of cabinets, as well as to roll equipment into place.

However, the capacity of the floor may become a structural concern if the data center grows faster than originally planned or new, heavier equipment is deployed beyond what the company had intended at construction time. Furthermore, seismic activity poses a danger to raised floors beyond what slabs face.


(4) Evaluation of Raised Floor and Panels


Modern raised floors for data centers are usually made of cement-filled steel or cast aluminum. For easy access, we need “lay-in” panels that can be easily removed, rather than the screw-down type that are bolted to the pedestals at each corner. And because cabinets in today’s data centers are getting heavier, we need the strength and stability of a “bolted stringer” understructure, rather than panels that just self-lock to the pedestals at the corners.

Panels have historically been labeled and marketed for their “concentrated load” ratings. This is the maximum load that can be applied to the weakest one square inch of the tile without deforming it by more than a specified amount. But different manufacturers provide other ratings, including "uniform load" (the average weight per square foot the panel can support when weight is evenly distributed across its four square-foot surface), "yield point" (where the panel permanently deforms) and "ultimate load" (where the concentrated load actually causes the panel to collapse or break).

Either way, it is the concentrated load or design load, not the uniform load, we care about most, since cabinets usually sit on small leveling feet or casters, not solid full-size bases. Uniform load is meaningless in a data center.




So what strength do we really need? There is a tendency to use the highest load rating simply because cabinets are getting heavier, but is that really necessary?

Stronger floors usually weigh more which, depending on the building slab rating, may reduce the useful cabinet weight that a raised floor can support. This is a reason to compare the weights of similarly rated panels, and is also why some data center designers advocate cast aluminum floors despite their much higher cost.

Although some cabinets may weigh 2,500 pounds or more, others will probably weigh less. If you only have several heavy cabinets, extra pedestals under them may be fine, but if you have too many heavy cabinets, extra pedestals could be forgotten with resulting damage to the floor.

Another important rating is "rolling load,” because we need to get cabinets across the floor and into position. One suggestion is to install stronger panels in your delivery paths, so the panels with different strengths are interchangeable in the floor structure.

It is important to carefully read manufacturers' data sheets. Since not all floor manufacturers test and specify the same way, it is also good to know how tests were run to compare ratings and determine whether they were done by independent testing labs.


(5) Raised Floor's Surface Material


We should also be concerned about the anti-static characteristic of a floor material. There are two types of floors that are often confused: conductive and static dissipative. Technical definitions classify static dissipative as a particular type of conductive floor, but manufacturers of raised floor products for data centers and clean rooms will generally identify them separately. Conductive flooring is typically used in clean rooms, where people are handling microchips. This type of flooring has a lower resistance to ground than static dissipative products. Conductive flooring is not needed, nor recommended, for data centers.

In data centers, we need static dissipative floors that will conduct static charges of more than 100 volts away from our bodies and clothing and through the floor tile to the ground. This requires a surface material to have the necessary static dissipative qualities, and a grounded understructure that prevents the generation of static electricity. The understructure should also conduct electrical charges away so that they are not harmful to our equipment. Ratings should be based on the resistance from any point on the panel surface to the pedestal, which also needs to be properly grounded to work.

The surface material on a computer room floor should be a zero-maintenance product. It should never need to be waxed or buffed, as wax accumulates dirt and must be removed with liquids, and buffing creates dust. The material must also be hard enough for equipment to roll over and sit on without denting or deforming. This rules out rubber and vinyl materials. And, of course, carpet of any kind should never be used, as it both creates and traps particulates. The most commonly used surface covering in data centers is known as high-pressure laminate (HPL). It can be made with the necessary static dissipative qualities and also has the hardness and maintenance characteristics needed. It should also be made so the laminate edges are not easily damaged.


(6) Budget, Cleaning and Maintenance


The area under a raised floor is a dirt and debris trap, but cleaning can be problematic. Furthermore, other problems such as addressing (and even identifying) moisture and breaches in walls plague this approach. Also, since out of sight is out of mind, the temptation to leave unused cabling and other junk in the plenum may be irresistible, particularly in a time-pressed environment, thus exacerbating the problem.

For data centers operated more than 5 - 10 years, replacing individual floor panels with special size may be required due to wear out and daily operations. Minimum order quantity (MOQ) requirement specifies the lowest quantity of the raised floor panels that a supplier is willing to sell. Spare panels are usually recommended and prepared in the data center design stage or extra budget may be required to settle the tailor-made issue.


(7) Security


This concern is particularly acute in the co-location facilities that serve multiple customers. For security concern, some cabinets stored sensitive data for critical purposes are installed inside a cage unit (from ceiling to raised floor, from raised floor to concrete slab floor) which is separated from other cabinets in a data hall. It should be prepared for this kind of installation.



* The Performance Selection Chart and Air Flow information are provided by MUFLOOR ASIA COMPANY LIMITED (http://www.mufloor.com). For details, please contact the local distributor.



About the Blogger

Strategic Media Asia (SMA) is one of the approved CPD course providers of the Chartered Institution of Building Services Engineers (CIBSE) UK. The team exits to provide an interactive environment and opportunities for members of ICT industry and facilities' engineers to exchange professional views and experience.

SMA connects IT, Facilities and Design. For the Data Center Consideration Series, please visit 


(1) Site Selection,
(2) Space Planning,
(3) Cooling,
(4) Redundancy,
(5) Fire Suppression,

(6) Meet Me Rooms, and
(7) UPS Selection



Monday, September 22, 2014

Invitation to Data Center Technical Visit (2 Sites) + CPD Course in Critical Facilities and Data Center Design


2-days CPD Course in Data Center Facilities Design and Infrastructure Engineering (23 - 24 October 2014)

(HKIE CPD Course Code: CPD1029)


The course is designed for Building Services Engineers, Facilities / Data Center Managers, IT Management, etc. to enrich and update the knowledge in critical facilities and data centers design & build. It is more than a general introductory program for data center. Topics include:


- IT strategy
- Cabinet layout
- Raised floor system
- Data center network and structure
- Telecommunication backbones, redundancy, sizing and planning
- Fiber and optical system design
- Fiber and optical cable components
- Copper cabling components
- Copper system design and high speed ethernet
- Cable distribution, layout and management
- Earthing / grounding and bounding

- Power (1) – high / low voltage system, switch system, etc.
- Power (2) – UPS, transformers, fuel tanks, generators, etc.

- Cooling (1) – cooling topology, hot / cold aisle, etc.
- Cooling (2) – chiller, CRAC, cooling towers, etc.

- Environmental management system
- Physical security
- Fire protection system


Date: 23 - 24 October 2014 (Thursday - Friday)
Time: 10:00 – 18:00 (14 Hours)

Venue: 20/F, New Victory House, 93 - 103 Wing Lok Street, Sheung Wan, Hong Kong
(Very Near Exit A2, Sheung Wan MTR Station)

Fee: Special rate for HKIE's all membership classes


For details and syllabus, please refer to the CPD Course Calendar of Hong Kong Institution of Engineers, HKIE (http://www.hkie.org.hk/eng/html/cpd/cpdviewer.asp?sn=3248).

Kindly complete and return an Application Form together with a crossed cheque made payable to “Strategic Media Asia Limited” - Room 1605, 16/F, Causeway Bay Plaza 1, 489 Hennessy Road, Causeway Bay, Hong Kong.






Half Day Technical Visit to Data Centers in Kwai Chung and Tseung Kwan O (8 October 2014)


Sponsored by IXTech (www.hkcix.com) and HKCOLO (www.hkcolo.net)


Further to the critical facilities course, a half-day technical visit is targeted to provide an interactive environment and opportunities for members of IDC industry to exchange professional views and experience on TWO data center facilities (Tier II and Tier III+) and services. 


Date: 8 October 2014 (Wednesday)
Duration: 13:45 - 18:00
Assembly Time: 13:45 - 14:00
Assembly Point: Exit D, Kwai Fong MTR Station (Kwai Yan Road, Next to the Bus Stop)


Fee: HK$100, Round-trip transportation will be provided
(Waiver for the 2-day CPD course's participants)


For details of the technical visit, please visit 


Monday, December 30, 2013

Invitation to Data Center Technical Visit + CPD course in Critical Facilities Design

2-day CPD course in Data Center Facilities Design
and Infrastructure Engineering (20 - 21 February 2014)

(HKIE CPD Course Code: CPD0227)

The 2-day CPD course is designed for Building Services Engineers, Facilities / Data Center Managers, IT Management, etc. to enrich and update the knowledge in critical facilities and data centers design & build.

Topics include:

- IT strategy
- Cabinet layout
- Raised floor system
- Data center network and structure
- Telecommunication backbones, redundancy, sizing and planning
- Fiber and optical system design
- Fiber and optical cable components
- Copper cabling components
- Copper system design and high speed ethernet
- Cable distribution, layout and management
- Earthing / grounding and bounding
- Power (1) – high / low voltage system, switch system, etc.
- Power (2) – UPS, transformers, fuel tanks, generators, etc.
- Cooling (1) – cooling topology, hot / cold aisle, etc.
- Cooling (2) – chiller, CRAC, cooling towers, etc.
- Environmental management system
- Physical security
- Fire protection system


Date: 20 - 21 February 2014 (Thursday - Friday)
Time: 10:00 – 18:00 (14 Hours)
Venue: 20/F, New Victory House, 93 - 103 Wing Lok Street, Sheung Wan, Hong Kong

Fee: Special rate for HKIE's all membership classes


For detail and syllabus, please refer to the CPD Course Calendar of Hong Kong Institution of Engineers, HKIE (http://www.hkie.org.hk/eng/html/cpd/cpdviewer.asp?sn=2936) or contact (852) 2117 3893.

Kindly complete and return an Application Form together with a crossed cheque made payable to “Strategic Media Asia Limited” - Room 1605, 16/F, Causeway Bay Plaza 1, 489 Hennessy Road, Causeway Bay, Hong Kong.






Half Day Technical Visit to Data Center in Tseung Kwan O
TELEHOUSE HONG KONG CCC

Sponsored by KDDI Hong Kong Limited (www.kddi.com.hk)


Further to the HKIE CPD Course, the half-day technical visit targets to provide an interactive environment and opportunities for members of IDC industry to exchange professional views and experience on critical infrastructure / E&M facilities:


Date: 12 February 2014 (Wednesday)
Time: 13:45 - 17:15
Meeting Point: Exit D, Kowloon Tong MTR Station (Please refer to a rundown attached)

Fee: HK$100, Round-trip transportation will be provided
(Waiver for the CPD course's participants)


Remark:

Business Card and HKID Card are required for the on-site registration. KDDI Hong Kong reserve the right to refuse any unexpected registration for the Technical Visit. In case of disputes, the ultimate decision will be reserved by KDDI Hong Kong.


TELEHOUSE HONG KONG CCC


TELEHOUSE HONG KONG CCC (Telehouse Hong Kong Cloud Computing Complex) is one of the largest (360,000 sq.ft) and most technologically advanced carrier neutral data center facilities in Hong Kong and in the Asia Pacific Region.

Operated by KDDI Corporation, TELEHOUSE HONG KONG CCC is a Tier 3+ purpose-built data center facility that is strategically located in Tseung Kwan O, Hong Kong. With virtually no risk of natural disasters in the vicinity, TELEHOUSE HONG KONG CCC is ideal for securing mission-critical business systems.



About The Blogger


Strategic Media Asia (SMA, www.stmedia-asia.com) is a leading technical training and event organizer for corporations specialized in data center design & build, E&M facilities, telecom, ICT, finance and colocation. Currently, SMA delivers a series of data center trainings and qualification programs in Hong Kong, Taiwan and Macau.

All these events / training seminars are designed to support the leadership needs of senior executives (Chief Information Officers, IT Directors / Managers, Facilities Managers, company decision makers, etc.) and to provide useful and applicable knowledge.

Monday, October 28, 2013

Now for Sale - Training Manual of "HVAC Design and Cooling Specialist for Data Center Efficiency"


HVAC DESIGN & COOLING SPECIALIST FOR DATA CENTER EFFICIENCY


This is a training manual developed by a team of experienced Chartered Engineers (CEng). For data center operators and facilities managers, we help you to understand key challenges and consider different factors, from design, testing, commissioning, sustainability and efficiency, of HVAC (Heating, Ventilation, and Air Conditioning) system for data centers.

In addition, the manual details the guidelines of data centers’ cooling criteria, HVAC load development, air distribution, liquid cooling, contamination, availability and redundancy, Computer Fluid Dynamic (CFD) model, energy efficiency, etc., from general theory to technical implementation.

To predict a data center’s power and heat loads over the years ahead is the hardest thing for data center owners. It introduces datacom power trends and cooling applications showing expected growth in power density for different types of computing equipment out to 2020.


Total Number of Page: 106
Total Number of Slide Contained: 204
Size: 210mm x 300mm x 10mm
Language: English
Color: Black & White
CD / Soft Copy: Not Included

THE MANUAL CONTENT



Datacom Equipment Power Trends and Cooling Applications

(a) load trends and their applications
(b) air cooling and liquid cooling of computer equipment

Design Consideration

(a) design criteria and HVAC load
(b) computer room cooling and air distribution
(c) liquid cooling
(d) availability and redundancy
(e) integration with other MEP system
(f) controls and computer fluid dynamics

Testing and Commissioning

(a) air cleanliness test, heat load test
(b) factory acceptance test and site acceptance test
(c) integrated performance test (IST)

Sustainable Design

(a) combined heat power plant (CHP)
(b) solar, geothermal and evaporative cooling method
(c) air side economizers
(d) desiccant unit

Energy Efficiency

(a) power usage effectiveness (PUE)
(b) chilled water plant optimization
(c) water side and air side equipment
(d) part load operation
(e) controls and energy management
(f) LEED certified data center
(g) building energy code