Showing posts with label MEP. Show all posts
Showing posts with label MEP. Show all posts

Tuesday, September 24, 2019

Learn MVAC / Air Conditioning System Design for Mission Critical Purposes



Air-Conditioning System Design for Critical Infrastructure (2-day)
4 -5 December 2019 - Approved CPD Course by CIBSE UK


This is a 2-day course for engineers who design or handle MVAC (Mechanical Ventilation and Air-Conditioning) equipment for mission-critical buildings / data center projects.

It highlights design principles such as psychrometric chart, cooling load calculation / estimation, etc. and the design considerations such as air distribution, availability / redundancy, common mistakes, Computer Fluid Dynamic (CFD) model, integration with MEPs (Mechanical, Electrical and Plumbing systems), etc.

You'll be able to make informed decisions about the best choices of cooling systems for mission-critical purposes and how system can best meet your project goal and SLA (Service Level Agreement).


Date: 4 - 5 December 2019 (Wednesday - Thursday)
Time: 09:00 - 17:30
Venue: 19/F, Officeplus (New Victory House),
93 - 103 Wing Lok Street, Sheung Wan, HK (Exit A2, Sheung Wan Station)


Fee: Special Rate applies for

(1) the HKIE / CIBSE or all professional membership classes in engineering; or
(2) more than 1 enrollment made at the same time


> Datacom Equipment Power Trends and Cooling Applications

-- Load trends and their application
-- Air cooling of computer equipment
-- Liquid cooling of computer equipment


> Design Consideration

-- Design criteria
-- HVAC load
-- Computer room cooling
-- Air distribution
-- Liquid cooling
-- Availability and redundancy
-- Controls
-- Integration with other MEP (Mechanical, Electrical and Plumbing) system
-- Computer Fluid Dynamics (CFD)


> Testing and Commissioning

-- Air cleanliness test
-- Heat load test
-- Factory acceptance test
-- Site acceptance test
-- Integrated performance test (IST)


> Energy Efficiency

-- Power usage effectiveness
-- Chilled water plant optimization
-- Water side and air side equipment
-- Part load operation
-- Controls and energy management
-- LEED certified data center
-- Building energy code


> Sustainable Design

-- Combined heat power plant (CHP)
-- Solar cooling
-- Geothermal cooling
-- Evaporative cooling
-- Air side economizers
-- Desiccant unit


For details, please visit www.stmedia-asia.com/newsletter_6.html.



Enrollment & Registration


Kindly complete and return an Application Form for seat reservation. Online Registration is also acceptable. Your seat will be confirmed once the payment is allocated. Thank you.
 


About the Organizer

Strategic Media Asia Limited (SMA) is one of the approved CPD course providers of the Chartered Institution of Building Services Engineers (CIBSE) UK. The mission is to provide an interactive environment and opportunities for the members of critical facilities industry and building services engineers to exchange professional views and experience.

For details, please visit www.stmedia-asia.com/about.html.




Subscribe to our Knowledge Blog in Critical Infrastructure Design

RELIABILITY & REDUNDANCY MATTER - Your facilities and IT infrastructure are complex that are different from general buildings and require special design and operation knowledge and skill. Understanding the design considerations and avoiding costly downtime are critical.
Subscribe to our Knowledge Blog (http://green-data.blogspot.com or http://data-center-design.tumblr.com), share your view and get monthly readings online. All topics focus on key components and considerations of designing / operating mission-critical facilities and infrastructure:-

(1) Site Selection,
(2) Space Planning,
(3) Cooling,
(4) Redundancy,
(5) Fire Suppression,
(6) Meet Me Rooms,
(7) UPS Selection,
(8) Raised Floor,
(9) Code & Standards,
(10) Transformers and Harmonic Distortion,
(11) Multi-mode UPS Systems,
(12) Electrical Rooms,
(13) Generator Systems,
(14) Generator Fuel Systems, 

(15) Battery Systems, etc.
 

P.S. Think your team might also be interested? Pass it on ›



Strategic Media Asia Limited

Connecting IT, Facilities and Design

T (852) 2117 3893  |  F (852) 2184 9978
Room 403, 4th Floor, Dominion Centre, 43 - 59 Queen's Road East, Hong
Kong


http://www.stmedia-asia.com  |  http://green-data.blogspot.com 





Tuesday, July 10, 2018

Building Information Modeling (BIM) for Electrical System Design

Building Information Modeling (BIM) is used frequently when working across multiple disciplines, including mechanical, electrical, plumbing, and fire protection engineering, and also with other stakeholders such as architects and contractors. Data Center Design with BIM is one of the obvious examples to facilitate and streamline complex design teamwork and coordination.

Consulting engineers, on the other hand, are facing with the same challenges, including the increment of speed and complexity of projects, which evolve codes and standards and a continual push for the electrical discipline to advance in BIM.


While BIM has been around for 20 years and is used regularly by architects and both structural and civil engineers, adoption by mechanical, electrical, plumbing (MEP), and fire protection engineering firms has only started to take off in more recent years. Today, as more architects require all parties working on a project to engage with BIM, consulting engineers are demanding the tools necessary to advance BIM in the electrical space, such as the ability to access more information online and easier access to BIM models and manufacturer support and expertise.



An overall view of a building shows a single mechanical, electrical, plumbing, and fire protection (MEP/FP) design model representing accurate location and overall dimensions of equipment and systems. This image is rendered from a single Revit model containing MEP/FP disciplines along with IT and audio-visual (AV) disciplines representing accurate location and overall dimensions of equipment and systems.


The value of BIM is that it gets the right information to all the right people at the right time, enabling collaboration, productivity, and insight. However, there are some challenges, particularly in the electrical space, that must be overcome for BIM to reach its full value.



A partial model view shows electrical equipment, mechanical/plumbing equipment ducts and piping, along with a related pump schedule.


One key challenge to BIM adoption in the electrical space is the lack of accurate, relevant, and standardized BIM content. To date, to move forward with BIM implementation, many firms have had to develop their own content libraries - often by downloading from a repository of manufacturers' products online.

This poses challenges, as many products are subject to frequent manufacturer updates; which means that maintaining an up-to-date content library becomes difficult. For example, if a user downloads an electrical panelboard and leaves it on his or her hard drive for several years, the product information in the BIM environment will quickly become outdated as the downloaded content remains static, yet the actual product continues to evolve.

It's critical that product data remains up-to-date in BIM models. BIM is not just a design tool that stops being used after the construction phase of a project; rather, it is an overall lifecycle tool that uses the information from conception through design and commissioning and into operation and maintenance of the building.

The power of BIM lies in the information. At any point in the lifecycle of a project, the information must be accurate to help reduce time-consuming errors and rework. Additionally, it must be accessible from virtually anywhere, at any time, and by all the project stakeholders - and it must be actionable to help inform the decision-making process with simulation and analysis.

Bridging the gap between BIM environments and product data is critical to the advancement of BIM in the electrical space.



About us

Strategic Media Asia (SMA) is one of the approved CPD course providers of the Chartered Institution of Building Services Engineers (CIBSE) UK. The team exists to provide an interactive environment and opportunities for members of ICT industry and facilities' engineers to exchange professional views and experience.

SMA connects IT, Facilities and Design. For the other design considerations, please visit 
(13) Generator Systems, etc.

All topics focus on key components and provide technical advice and recommendations for designing a data center and critical facilities.




Wednesday, March 21, 2018

Data Center Design Consideration: Electrical Rooms (1)

Switchboards, switchgear, transformers, generators, and UPSs require space for installation, maintenance, heat dissipation and future expansion (if possible). The wiring, busways, and raceways that distribute the electrical power must be accounted for now or in the future.

Electrical engineers should coordinate with mechanical engineers, architects, structural engineers, and others involved in the design of electrical rooms. Documentation and monitoring of electrical system’s equipment and how it connects to the rest of the facility must be accurately maintained.

We are going to explain the applicable code requirements and evaluate the design criteria for appropriate electrical-room size to accommodate present and future needs. Furthermore, we analyze the requirements for coordinating with structural, architectural, fire protection, and HVAC requirements.


   


Electrical rooms and mechanical, electrical, and plumbing (MEP) spaces are often an afterthought when it comes to building design and planning, either relegated to locations that are left over or deemed undesirable for other planning purposes. This shortsightedness can have unfortunate consequences on the cost, operations, and flexibility of the systems for the future.

NFPA 70: National Electrical Code (NEC) dictates the minimum amount of space needed around the equipment for access, operations, safety reasons, and conduit installation. Together, with the actual equipment sizes, this defines the overall minimum dimensional requirements of the room.





There are three types of general interior electrical spaces that factor into new building design: (1) main equipment rooms, (2) distribution pathways, and (3) local/branch equipment rooms. Code-required working space and dedicated space needs must be met. This article will outline important considerations for these spaces in the early stages of building design as they relate to building type, intended occupancy, size, and future expectations of both the building and the electrical systems.


Working Spaces


Let’s see the different between working and dedicated space as stated by the NEC (see picture below). The working space helps safeguard a clear working zone around all equipment and ensures protection for any workers or occupants within the room. This includes defining minimum width, depth, and height requirements for the working space, which varies due to voltage and the specific equipment. The higher the voltage of the equipment, the greater the depth of the working space. The width should be equal to the width of the equipment and no less than 30 in., while allowing for opening any doors or hinged panels to a full 90 deg. The height should be 6 ft 6 in. from the floor, or the height of the equipment if greater than 6 ft 6 in.

The style and construction type of the electrical equipment dictates whether only front access is required, or if rear and/or side access also is required. For each point of access to a piece of equipment, the minimum working clearances must be provided.



The dedicated space (depicted in red) and the working clearances (depicted in blue) are shown in a new emergency distribution room.


Dedicated Spaces


Dedicated space is a zone above the electrical equipment. It’s reserved to provide future access to the electrical equipment, protection of the electrical equipment from foreign systems, and for installing conduit/other raceways supporting incoming and outgoing circuits. The requirement for dedicated space applies primarily to switchgear, switchboards, panelboards, and motor control centers. The space should be equal in width and depth to the equipment size and extend from the floor to a height of 6 ft above the equipment (or to a structural ceiling, whichever is lower). No equipment or systems foreign to the electrical installation are allowed in this zone by the NEC.



The medium-voltage switchgear sections and unit substation transformers in a large data center installation require additional space and clearances.


The area above the dedicated space may contain foreign systems, provided proper protection prevents damage from drips, leaks, or breaks in these systems. However, it’s good practice to avoid having these systems installed in electrical rooms altogether.

While installations of equipment greater than 1,000 V generally follow the same principles, some of the specifics vary, requiring additional clearance around the equipment due to the increased hazard that these voltages impose (see picture above). Access to this equipment is preferably limited to only those deemed qualified to be there. For this reason, electrical equipment should be installed in rooms or spaces that are dedicated for that purpose and have controlled access.


Main Equipment Rooms


The main electrical room, or service entrance space, should coordinate with the local electrical utility. For example, main equipment rooms have requirements that dictate access to the space from the exterior for servicing, maintenance, and service feeder installation. The type of equipment installed will also further determine the room requirements. The service entrance room is typically located on an exterior wall for both code and practical reasons; it makes installation easier and minimizes the length of the service entrance conductors. Because the service conductors are usually the largest in the facility, this can have a substantial impact on cost.

Using arc-resistant switchgear will also impact space needs. This equipment will be taller and may have a larger footprint. Engineers will also need to account for the potential exhaust gases and arc flash energy by providing a pathway to expel them and relieve the pressure buildup from inside the switchgear.

If an exterior transformer is used to provide the service to a building, feeders from the transformer enter the building and transition to the main service entrance disconnect, typically a switchgear, switchboard, or panelboard. These feeders are often routed underground into the building through the exterior foundation wall via a coordinated opening. Additional coordination with the structural engineer is needed to avoid footings.

The elevation of the service entrance conduits many times do not naturally align with the equipment to which it is routed. Additional space in the form of increased height or footprint commonly is required to allow for the successful transition and termination of these conduits and conductors. Service installations that require medium-voltage equipment and/or transformers installed indoors will require additional elements including more space, higher fire ratings of the rooms (per NEC Article 450), and increased ventilation.

The location of any exterior equipment also needs to be coordinated with other architectural and landscaping elements. Minimum separation distances are often dictated by local codes/ordinances or utility requirements for proximity to screen walls, fencing, vegetation, paths of egress, or building fenestration.

Generator installations offer additional challenges when it comes to defining space needs. Noise, odor, and vibration factor into the location of this equipment within a building. The equipment should be located to minimize disturbances to building occupants and adjacent properties. Many jurisdictions have specific requirements on noise emissions, which will impact equipment placement and other components needed to meet requirements. Increasing the distance of this equipment from sensitive areas is one way of dealing with the concerns, but this comes with added feeder costs and may prove to be more costly than other options.

Sound attenuation and equipment required to meet specific emissions requirements, such as diesel oxidation catalyst, particulate filters, urea tanks, and selective catalytic reduction units, have significant cost implications and require a large amount of space to install.

Tier 4 versus Tier 2 compliance is usually dictated by an owner’s desire to use a generator for utility peak shaving or other non-critical proposes. It is crucial to have a clear understanding of current and future implications in both of these areas from the outset of a project and to discuss them thoroughly with the building owner.

The weight of a generator and the vibration experienced during its operation will have an impact on the building’s structural design. Generators require a lot of ventilation for cooling and combustion needs; getting air into and out of the room is critical and will impact placement.

With regard to fuel storage, most installations require a volume of fuel that dictates an external fuel tank with interconnecting fuel lines. NFPA (National Fire Protection Association) limits the overall capacity of diesel fuel inside buildings to 660 gal. The relationship of the exterior tank and the generator is also important to minimize pumping requirements and allow for gravity-drain return-fuel piping. This requires the fuel tank to be lower in elevation than the generator.

Direct access to the outside is preferable for maintenance and testing. All of this requires close coordination with the architectural, structural, and mechanical disciplines.

NFPA 110: Standard for Emergency and Standby Power Systems requires the emergency power supply for Level 1 installations to be installed in a separate room, separated from the rest of the building by 2-hour fire-rated construction. While NFPA 110 does allow the emergency power supply system equipment (EPSS; equipment consists of all components from the emergency power supply, or EPS, to the load terminals of the transfer switches) to be installed in the same room as the EPS, it is good practice to keep these separated to help enhance system resiliency. EPS rooms are also prone to additional dust, moisture, temperature fluctuations, and excessive noise during operation that limits the ability to have a conversation and may have a negative impact on other equipment if co-located.

For mission-critical facilities (e.g., financial institutions, data centers, and airports) and other highly sensitive installations, the use of a dry-type, pre-action, or another type of fire protection system that does not rely on a normally wet piping installation is highly recommended. In cold climates, this has an added advantage of preventing pipes from freezing, rupturing, and potentially flooding the EPS room.


Continue Reading: Part (2) - Data Center Design Consideration: Electrical Rooms


About us

Strategic Media Asia (SMA) is one of the approved CPD course providers of the Chartered Institution of Building Services Engineers (CIBSE) UK. The team exists to provide an interactive environment and opportunities for members of ICT industry and facilities' engineers to exchange professional views and experience.

SMA connects IT, Facilities and Design. For the Data Center Design Consideration, please visit 

All topics focus on key components and provide technical advice and recommendations for designing a data center and critical facilities.

Wednesday, October 25, 2017

Understand the Cooling and Ventilation System Design for Data Center


Air Conditioning System Design for Data Center
(23 - 24 March 2017, approved CPD course by CIBSE UK)


It targets to engineers involved in designing or handling HVAC (Heating, Ventilation and Air Conditioning) equipment for mission critical facilities, IT infrastructure and data center projects.

All sessions highlight design principles such as psychrometric chart, cooling load calculation / estimation, etc. and the design considerations such as air distribution, availability / redundancy, common mistakes, Computer Fluid Dynamic (CFD) model, integration with MEPs (Mechanical, Electrical and Plumbing system), etc.

You'll be able to make informed decisions about the best choices of cooling systems for mission critical purposes and how system can best meet the project goal and SLA (Service Level Agreement).


Date: 23 - 24 March 2017 (Thursday - Friday)
Time: 10:00 - 17:30
Venue: 14/F, On Lok Yuen Building, 25-27A Des Voeux Road Central, Hong Kong
Fee: Special rate for CIBSE / HKIE all membership classes



> Datacom Equipment Power Trends and Cooling Applications

-- Load trends and their application
-- Air cooling of computer equipment
-- Liquid cooling of computer equipment


> Design Consideration

-- Design criteria
-- HVAC load
-- Computer room cooling
-- Air distribution
-- Liquid cooling
-- Availability and redundancy
-- Controls
-- Integration with other MEP (Mechanical, Electrical and Plumbing) system
-- Computer Fluid Dynamics (CFD)


> Testing and Commissioning

-- Air cleanliness test
-- Heat load test
-- Factory acceptance test
-- Site acceptance test
-- Integrated performance test (IST)


> Energy Efficiency

-- Power usage effectiveness
-- Chilled water plant optimization
-- Water side and air side equipment
-- Part load operation
-- Controls and energy management
-- LEED certified data center
-- Building energy code


> Sustainable Design

-- Combined heat power plant (CHP)
-- Solar cooling
-- Geothermal cooling
-- Evaporative cooling
-- Air side economizers
-- Desiccant unit


For details, please visit http://www.stmedia-asia.com/newsletter_6.html.





Get Ready to Become a Registered Specialist Contractor (Ventilation)
(29 April & 6 May 2017, Saturday)


Designed for enterprises in ventilation / air-conditioning engineering - Technical Director (TD), Authorized Signatory (AS) or other officers, our speaker introduces the register requirement, interview technique, Buildings Ordinance, ventilation and fire safety, occupational safety, health and environmental protection, etc.

The preparatory course helps local engineers and enterprises to facilitate compliance with the Buildings Ordinance in Hong Kong and to get ready to become a Registered Specialist Contractor for Ventilation Works (RSC-V).


Date: 29 April + 6 May 2017 (Saturday) - 11th round
Time: 9:00 - 13:00 / 13:30
Venue: 14/F, On Lok Yuen Building, 25-27A Des Voeux Road Central, Hong Kong
Fee: Early bird discount available for payment & application made before March 17, 2017


The RSC-V preparatory course is also available online www.stmedia-asia.com/aircon.html.





About us


Strategic Media Asia (SMA) is one of the approved CPD course providers of the Chartered Institution of Building Services Engineers (CIBSE) UK. The team exists to provide an interactive environment and opportunities for members of ICT industry and facilities' engineers to exchange professional views and experience.

SMA connects IT, Facilities and Design. For the Data Center Consideration Series, please visit 


(1) Site Selection,
(2) Space Planning,
(3) Cooling,
(4) Redundancy,
(5) Fire Suppression,
(6) Meet Me Rooms,
(7) UPS Selection, and
(8) Raised Floor

All topics focus on key components and provide technical advices and recommendations for designing a data center and critical facilities.



Tuesday, August 8, 2017

Course in Data Center Infrastructure and Operations

CPD Course in Data Center Infrastructure and Operations
Organized Jointly with the Society of Operations Engineers (SOE), Hong Kong



IT support is crucial to every business and public sectors. No matter a few servers in a closet or a hundred of servers in a data center, all equipment and MEP (Mechanical, Electrical and Plumb) facilities required are mission-critical to maintain the IT services.

The course outlines the infrastructure system supports a typical data center and critical services and the main components facilitate a data center operations and maintenance. It also introduces the best practices and the international standards for data centers and critical facilities.

The course is designed for facilities engineers and IT infrastructure operators to acquire in-depth knowledge in designing critical infrastructure and data center operations.


  • What is Data Center
  • Applications of Data Center
  • Who are the Users
  • Users’ Expectations
  • Inside a Data Center – IT, E&M Services, Facilities Supports
  • Data Center Configurations – Architectural, Structural, MEP, Network
  • Glossary – Resilience, Tier Levels, Redundancy
  • Operating a Data Center
  • Loss Prevention
  • Maintenance Management
  • Facilities Supports – MEP Services
  • Specific Requirements for Facilities
  • Operations Highlights
  • Sustainable Management
  • System Performance Assessments

Speaker:           Ir C.K. Chan, BEng (Hons), MSc, BBA, CEng, MHKIE, MIET, REA /
                          Mr. Ian Ip, BSc (Hons), MSc, CEng, MCIBSE

Time:                07:00 pm – 10:00 pm (Total 15 Hours)

Venue:              Flat C, 12/F, Blk 2, Wah Fung Ind Ctr, 33 - 39 Kwai Fung Crest, Kwai Chung, HK

Fee:                  Special Rate for all SOE Members

Certification:    15-hour CPD certificate will be issued to students who completed
                         and pass the course assessment with attendance over 70%.

Inquiry:            Please contact Anna (852) 3188 0062 or email to info@soe.org.hk for registration.


For details, please visit www.soe.org.hk.







Tuesday, January 24, 2017

Data Center Design with Building Information Modeling (BIM)


   


Data center design involves a lot of timing of schedules, organization, tracking of materials and changes, etc. with complex design teamwork and coordination. For this reason, the process of Building Information Modeling (BIM) is introduced to facilitate and streamline data center project designs:


Better project coordination

BIM allows everyone - architects, electrical and mechanical engineers, project managers, etc. - involved in the project to input their data into the shared model. Information is kept in one place, which helps with communication and project coordination. 


Faster fault detection and assessing problems

Using 3D computer models allows the project team to detect and evaluate errors or fault easily that could cause an issue during construction. Your mission-critical building is shown in scale, and you are able to enter manufacturer details / data into a 3D model, visualizing the whole project and important issues during the design.


Deeper design preparation with improved management

Data centers is designed for large amounts of IT equipment supported by critical facilities (MEP - mechanical, electrical, plumbing equipment). All of these equipment & facilities have high power consumption. They must be fit properly, have proper distribution and suit certain service clearances. The routing of BIM allows electrical & mechanical (EM) designers and structured cabling system designers ( for optical fiber, high voltage / low voltage cables, etc.) to know exactly where to model for heat dissipation and adjust for any electrical duct work, and allows engineers to adjust for proper air flow.




For the raised-floor, it can be especially tricky. Most floor installers do not model their installations — adjustments for structural bridging and support are typically made in the field. Creating a BIM model of the flooring allows the installer to understand where the MEP systems are located in relationship to the pedestal support systems.Flooring installers can see where they need to modify their support framing early in the process and fabricate the necessary bridging and support components to span across the MEP systems where necessary. This eliminates the time and effort it would take to do this in the field once the MEP systems are installed, thus decreasing the field installation time.

By incorporating computational fluid dynamic (CFD) simulations into the BIM model, engineers can evaluate and fine tune server layouts based on the thermal modeling. You’re able to visualize how the air will flow inside the data center and see the temperature variation based on the height and how the air is moving. It’s especially helpful in being able to see how the servers in a computer room receive cold air and how hot air is removed (hot aisle & cold aisle).


Smoother commissioning and operations & maintenance (O&M) tasks

Data centers require a series of precise commissioning process to ensure performance and reliability. Commissioning information tags for each piece of equipment and feeder can be added to the BIM model to keep a live database of commissioning process status. These information are so valuable to the operational staff, such as submittals, O&M manuals, as-built plans, balancing reports and commissioning reports. When this information is inserted into the BIM database, the information can be retained and viewed for each piece of equipment, rather than in separate volumes. Data center operators would benefit from a comprehensive set of information.



Source: BICSI - BIM in Data Center Design (www.youtube.com/watch?v=u3ExZq-3iMA)


About us


Strategic Media Asia (SMA) is one of the approved CPD course providers of the Chartered Institution of Building Services Engineers (CIBSE) UK. The team exits to provide an interactive environment and opportunities for members of ICT industry and facilities' engineers to exchange professional views and experience.

SMA connects IT, Facilities and Design. For the Data Center Consideration Series, please visit 


(1) Site Selection,
(2) Space Planning,
(3) Cooling,
(4) Redundancy,
(5) Fire Suppression,
(6) Meet Me Rooms,
(7) UPS Selection, and
(8) Raised Floor

All topics focus on key components and provide technical advices and recommendations for designing a data center and critical facilities.



Tuesday, September 15, 2015

Course in Air Conditioning System Design for Data Center


A data center houses hundred / thousand of IT equipment and servers for mission critical purpose. These IT facilities consume large amount of energy and generate heat during operations. Particular cooling strategies and power system design are therefore required for a data center.




This is an advanced learning section for data center design. It targets to engineers involved in designing or handling HVAC (Heating, Ventilation, and Air Conditioning) equipment for mission critical facilities and data center projects.




We introduces various classifications of HVAC systems and the associated distribution systems for mission critical facilities. Each system type is evaluated based on the performance for energy efficiency, water use and comfort performance. Participants are able to make informed decisions about the best choices of cooling systems for mission critical applications and how system can best meet your project goal and SLA (Service Level Agreement).




The course highlights design principles such as psychrometric chart, cooling load calculation / estimation, etc. and the design considerations such as air distribution, availability and redundancy, common mistakes, Computer Fluid Dynamic (CFD) model, integration with MEPs (Mechanical, Electrical and Water Plumb), etc.




Overall we train participants to understand different factors, from design, testing, commissioning, sustainability and efficiency, that significantly impact the cooling system of data centers.


  • Datacom Equipment Power Trends and Cooling Applications
    • (a) load trends and their application
    • (b) air cooling of computer equipment
    • (c) liquid cooling of computer equipment

  • Design Consideration
    • (a) design criteria
    • (b) HVAC load
    • (c) computer room cooling
    • (d) air distribution
    • (e) liquid cooling
    • (f) availability and redundancy
    • (g) integration with other MEP system
    • (h) controls
    • (i) computer fluid dynamics

  • Testing and Commissioning
    • (a) air cleanliness test
    • (b) heat load test
    • (c) factory acceptance test
    • (d) site acceptance test
    • (e) integrated performance test (IST)

  • Sustainable Design
    • (a) combined heat power plant (CHP)
    • (b) solar cooling
    • (c) geothermal cooling
    • (d) evaporative cooling
    • (e) air side economizers
    • (f) desiccant unit

  • Energy Efficiency
    • (a) power usage effectiveness
    • (b) chilled water plant optimization
    • (c) water side and air side equipment
    • (d) part load operation
    • (e) controls and energy management
    • (f) LEED certified data center
    • (g) building energy code


    For registration and course details, please visit www.stmedia-asia.com/newsletter_6.html.

    "Air Conditioning System Design for Data Center" is an approved CPD course by Chartered Institution of Building Services Engineers (CIBSE).



    About the Organizer - SMA


    Strategic Media Asia Ltd (SMA) is one of the Approved CPD Course Providers of the Chartered Institution of Building Services Engineers (CIBSE). SMA exists to provide an interactive environment and opportunities for members of IDC industry and engineers to exchange professional views and experience on data center design, critical infrastructure system, electrical and mechanical facilities, etc.

    SMA connects IT, Facilities and Design. For details, please visit our website at www.stmedia-asia.com/trainings.html.





    Tuesday, August 25, 2015

    Data Center Design Case Study

    When the reliability demand is high and the data center has to work around pre-existing building constraints, there are significant design challenges.




    With approximately 120,000 sq ft of white space divided into eight Tier III, 2 MW power data halls, the 20 MW data center meets a number of design challenges before construction even began.

    The data center was originally the site of an old manufacturing facility. Coupled with the owner’s building requirements, this created a few challenges to the data center’s electrical distribution system design. Here’s a look at how Environmental Systems Design, working together with the other members of the building team, was able to solve them.


    Challenge No. 1: The transformer


    In an effort to maintain consistency across others data centers, the corporation likes to specify company-standard mechanical, electrical, plumbing (MEP), and fire protection equipment for all of its mission critical facilities. However, much of this equipment is designed for outdoor use, and because this particular facility has very limited outdoor space, significant adjustments had to be made for the transformer and switchgear equipment to work indoors.




    For example, the heavy transformer couldn’t be placed on the raised floor designed for the data hall and electrical room space and wouldn’t be able to be removed from the building at the end of its useful life, as the 2500 kVA transformers each weigh approximately 16,000 lbs.

    Instead, the facility was designed with the intent of moving in the transformer prior to the raised floor construction. Coordinating with the architect, saw cuts were designed into the pre-cast panels on the side of the building to make it easier for the contractor to remove/replace the exterior wall to get the transformer out for future installations or replacement.

    Additionally, because the liquid-filled transformers specified are typically used outdoors, special design considerations were needed for the electrical room to contain the fluid in the event of a leak. A 4-in. metal dam was constructed along the perimeter of the room to contain the liquid, while perforated raised-floor tiles were installed around the transformer to facilitate the flow of liquid to under the floor.


    Challenge No. 2: Uniform design


    The owner wanted a repeatable, scalable design for each of the eight data halls to both create uniformity across the facility and provide the ability to build out data halls as needed over time. However, due to existing building conditions, including the different quantity and compact nature of the structural columns on the building’s first and second floors, an offsite modular construction design was eliminated.

    Instead, the solution was to bring each component of the mechanical and electrical systems into the facility individually and build out the data halls one at a time as identically as possible.


    Challenge No. 3: Medium-voltage equipment


    Because the switchgear and transformers were located inside the building, medium-voltage (MV) feeders were routed throughout. The MV system itself was daisy-chained so it had to be installed and commissioned in its entirety when the first of the eight data halls were installed.




    The active MV system presents a potential risk to workers during construction. Therefore, the MV feeders and conduit were routed through the ceiling of the first floor for safety, stubbing back up through the second floor slab and directly into the equipment. The feeders for the first floor equipment were routed similarly under the first floor slab. Because the eight data halls will be built out over time, this technique permits construction on the floor without subjecting workers to the active feeders.


    Challenge No. 4: Switchgear and metering equipment


    With very limited space for outdoor equipment, there wasn’t enough room for the utility’s 34.5 kV ground-level switchgear and metering. In addition, this equipment has not been fully vetted for the application and was seen as a risk by the owner. The only option was for the utility’s switchgear and metering to be pole mounted. This meant that the site’s 20 poles had to be spaced 20 ft from each other, taking up 400 ft of linear space on a site with little outdoor area.





    The Reliability


    Utility Service:

    2N, or two separate utility sources/feeders, one general source and the second as backup. The switchgear is daisy-chained together, creating a connection from one switchgear to another down the line so that the power can feed into one switchgear, back out and into the other, rather than having multiple connections to the site.


    Backup generators:

    N+1 redundant swing generator. While each of the eight data halls has its own backup generator, another redundant swing generator for every two to three halls was designed as well, providing additional backup (a total of four swing generators in all). This provides an extra level of redundancy without the cost of providing an additional backup for each generator.


    UPS system and distribution (2N):

    Two sides to the electrical system were designed, where each side is a mirror of the other. The benefit of the 2N system topology allows for maintenance or a fault to occur on one of the sides, while still maintaining a completely active data center.



    About Strategic Media Asia Ltd


    Strategic Media Asia Ltd (SMA) is one of the Approved CPD Course Providers of the Chartered Institution of Building Services Engineers (CIBSE). SMA exists to provide an interactive environment and opportunities for members of IDC industry and engineers to exchange professional views and experience on data center design, critical infrastructure system, electrical and mechanical facilities, etc.

    SMA connects IT, Facilities and Design. For details, please visit our website at www.stmedia-asia.com/trainings.html.