Data Center Design Consideration: Electrical Rooms (2)

So far we have reviewed few types of general interior electrical spaces that factor into new building design in Part (1) - Data Center Design Consideration: Electrical Rooms - Working Spaces, Dedicated Spaces and Main Equipment Rooms.

Let's further explore the considerations of Distribution Pathways and Local/Branch Equipment Rooms when designing MEP spaces.



Distribution Pathways

Distribution pathways are needed for interconnecting all the electrical equipment and end-user devices, and the pathways will affect where rooms are located. Conduits can be routed above the equipment, below ground, or in the ceiling space of the floor below, though overhead conduits need space within the rooms to leave the equipment and transition to the desired route going to other parts of the building (see picture below). The routing of the feeders and how they enter/exit the distribution equipment must be evaluated during design and reconfirmed during the shop drawing review, as this will impact how the equipment is constructed and affect its physical size.



Conduit pathways need to be considered when designing electrical rooms to ensure proper clearances are met and that the distribution is efficient.


Below grade conduit routing needs to be coordinated with other utilities and footing/foundation elements. The restrictions that these place on the routing may impact the layout of the equipment in the room and the size of the space needed. Similarly, beams on the floor above or below the equipment may require an offset of conduit or shifting of the equipment to allow for the conduit installation to effectively occur.

Horizontal pathways can define the placement of electrical rooms, as other building elements may impede these routes and affect installation. Structural beams and large ductwork can become obstacles, especially in tandem with high ceilings. Large-volume spaces like gymnasiums and atriums require extra care as to how conduit will be routed across or around these areas, especially when the entering/exiting pathway would be lower in elevation than the ceiling.

Vertical risers are typically accommodated in either one of two ways—through shafts (pull boxes may be required depending on the height of the building and conduit layout) or stacked electrical closets. Stacked closets allow for the busway or conduits that distribute power throughout the building to be run through these spaces for a more efficient and less expensive installation. If these closets are constructed with 2-hour-rated partitions, the stacked rooms can provide the code-required circuit protection for EPSS feeders and fire alarm circuits without having to rely on more costly wiring methods.


Local/branch Equipment Rooms

A third space type, the local/branch equipment room, is often referred to as an electrical closet (see picture below). Distribution panels, branch circuit panels, and low-voltage transformers are typically located in these spaces and directly serve the end-user loads: lighting, receptacles, and small equipment. Lighting control system panels and devices (and other electrical system devices) are sometimes also located in these rooms. Given the amount of change that occurs in buildings over their lifespan, extra wall space should always be provided in these rooms for future equipment.



The electrical closet is arranged to meet multiple requirements. First, all code clearances have been met. Additionally, it provides a vertical pathway for feeders extending up through the building.


In multistory buildings, these spaces should be stacked. The placement of electrical closets within a building’s footprint is often an item of much debate and discussion with the rest of the design team. The NEC has set restrictions on piping and ductwork routed through these rooms (i.e., dedicated spaces). Conduit needs to be routed out of the room to the floor or area served; minimizing branch circuit lengths help avoid excessive voltage drop and reduce distribution costs. These rooms should be located as close to the center of the area served, with conduits routed out in all directions.

Avoid specific adjacency to other building elements. Often, closets are targeted for location next to mechanical shafts, but the need to get duct-work and/or piping out of these becomes challenging and conflicts with the electrical equipment’s dedicated space. Similarly, locations next to stairs or elevator shafts present other challenges and limit the routing of conduits out of the electrical rooms. Locating electrical rooms next to these, especially if placed between, should be carefully evaluated to ensure there is enough space and flexibility for conduits.


Additional Space Needs

Outside of working- and dedicated-space needs, there are many special considerations for electrical rooms that depend on building programs as well as exterior spaces that will directly impact how the electrical systems are designed. The needs and expectations associated with an office building are very different from that of a data center or hospital with regard to the electrical distribution systems. Redundancy and resiliency are essential for mission critical-type facilities. Flooding due to natural disasters is a key element in determining equipment placement. These equipment should be located above the anticipated flood levels. This ensures ongoing continued operations during and after an event.




Mission critical and safety-critical installations require added redundancy to ensure the continuity of business operations. Redundancy of systems requires more space, as the equipment is separated into different rooms in different parts of the building. Having panels that are part of a redundant distribution arrangement (A and B sources) located adjacent or in close proximity to each other in the same electrical room greatly minimizes the value that the intended redundancy offers. The redundant equipment should be located in separately rated spaces, with the A sources and distribution located apart from the B sources and distribution.





Additional clearance requirements include allowing for future equipment to be moved into a room or allowing for the eventual replacement of that same equipment. While code may only require 3 or 4 ft of clearance in front of a piece of equipment, the physical dimension of the equipment could be larger. Because of this, the only way to effectively remove and reinstall a replacement is to leave an area that is larger than the footprint of the equipment.

Getting equipment from the exterior of a building to its final location may not always be a concern during the initial building construction, but it will certainly be an issue during later time periods of equipment modifications, additions, or replacement. The entire pathway from the building exterior, including doorways, may need to be enlarged due to the height or width of the equipment. If the equipment is located on a floor level that is below- or abovegrade, then area wells, reinforced floors, and a pathway or removable sections of the exterior wall assembly may be required.





Buildings are expected to have a life well beyond the initial install, and yet future growth and conduit installation are rarely considered. This automatically infers change, which will likely come in the form of added equipment and conduit. Initial planning and system design should account for this by including spare breakers, additional distribution sections, and oversized-conduit rack supports.



About us

Strategic Media Asia (SMA) is one of the approved CPD course providers of the Chartered Institution of Building Services Engineers (CIBSE) UK. The team exists to provide an interactive environment and opportunities for members of ICT industry and facilities' engineers to exchange professional views and experience.

SMA connects IT, Facilities and Design. For the Data Center Design Consideration, please visit 
(12) Electrical Rooms (I) and (II)

All topics focus on key components and provide technical advice and recommendations for designing a data center and critical facilities.



Wednesday, April 5, 2017

A Data Center Nightmare: Single Point of Failure (2)

Refer to "A Data Center Nightmare: Single Point of Failure (1)"


Data center failures can be rooted in several sources - design, construction, maintenance, quality of material, quality of equipment, commissioning and direct human intervention. For the most part, data centers, even ones that fail, have the benefits of good design practice and intention, professional construction oversight, and high-quality craftsmanship. They are maintained according to data center quality guidelines. But a single overlooked mistake can quickly become significant issues - power and air conditioning failure - that can bring down a data center.

Another story is a high-profile government data center, with a busduct-panelboard connection exploded, effectively shutting off power to approximately 15,000 square feet of the most critical computing in the facility.




In this incident, the design relied on an isolated redundant uninterruptible power supply (UPS) back-up. When a UPS system failed, a static automatic transfer switch was to shift to the already-operating isolated redundant UPS and transfer the load within a quarter cycle. The system worked well and the client was satisfied with the transfer scheme and the rotary concept.


Source of the Problem


Where this system failed was downstream from the automatic transfer switch. Each of the switches fed one busduct riser and terminated directly into a main distribution panel located on each floor of the facility - one busduct per panel. A single fault on any busduct or main distribution panel compromised the critical load.

As it occurred, the electrical connection between the busduct and the distribution panelboard failed and the load was lost. A single point of failure succeeded in bringing down the floor. Not until the facility’s electricians ran jumper cables from one of the intact risers and back-fed the main distribution panel did the floor have power.




Why did this failure occur? The building had been designed in tight coordination between the government representative and the designer; the entire system had been commissioned and had been running with tight oversight for more than two years. What happened?

The cause of the problem was the failure of a manufactured busduct connector, one of hundreds in the building. The connector joined lengths of feeder busduct via a sliding piece - designed to slide approximately one-quarter of an inch to make installation easier - and a break-away torque bolt designed to ensure that the installer did not over-torque the bolt.

Although the investigation team was not asked to explain exactly why the joint exploded, it determined that the quarter-inch of play designed into the connector had actually allowed for a portion of uninsulated section of the copper busduct to be exposed to the atmosphere without insulation. The team surmised that the perfect combination of air borne dust, humidity and possibly other contaminants led to an arc that became a fault and exploded.

During the analysis, the investigation team isolated each busduct riser from the static automatic transfer switch at the source and from the main distribution panel at the termination. During the megger test, the electrical forensic team discovered two additional joints that didn’t pass, clearly more candidates for potential failure. Not only did the joints not pass the megger test, two of them visibly and audibly arced while the voltage was ramped up during the testing. The joints had shown themselves to be the weak link in the system. The installed busduct technology was vulnerable to catastrophic failure.



Continue - A Data Center Nightmare: Single Point of Failure (3)



About the Blog


Strategic Media Asia (SMA) is one of the approved CPD course providers of the Chartered Institution of Building Services Engineers (CIBSE) UK. The team exists to provide an interactive environment and opportunities for members of ICT industry and facilities' engineers to exchange professional views and experience.

SMA connects IT, Facilities and Design. For Data Center Design Consideration, please visit 


(1) Site Selection,
(2) Space Planning,
(3) Cooling,
(4) Redundancy,
(5) Fire Suppression,
(6) Meet Me Rooms,
(7) UPS Selection, and
(8) Raised Floor